Home Domestic A BlueLine® Turbine Control System upgrade at the Generating Station, Lincoln Nebraska
05 | 09 | 2010
Newsflash

Customer feedbacks from Peru:
“The changeover to Blueline® was entirely trouble-free. Thanks to Blueline logic and electronics we can continue to exploit the full potential of our turbines and electrical sytems.”
"I take this opportunity to express my appreciation for the excellent work done in the GT12 unit. The staff covered all our expectations and we recommend it be designated to work on the GT11 unit to be held next in April 2010"

A BlueLine® Turbine Control System upgrade at the Generating Station, Lincoln Nebraska PDF Print E-mail
Projects - Domestic BlueLine Projects
Written by Iryna Butler   
Friday, 02 April 2010 10:21

We are pleased to be upgrading the current Egatrol 300 turbine control systems for two GT11NM gas turbine sets in Lincoln Nebraska.  With the kick off meeting scheduled for the end of April 2010, the project will be successfully completed by November 1, 2010.  

Our advanced BlueLine® turbine control system will replace the obsolete Taylor MOD300 controllers, inclusive of all remote Trio I/O blocks, which are responsible for open loop control and protection of the gas turbine set.  Additionally, the gas turbine closed loop controllers, which are built on Procontrol P13 will have their processors upgraded to BlueLine® CP01’s allowing use of the advanced features of the BlueLine® tools engineering software. 

As part of the controls upgrade the newly integrated BlueLine® speed input hardware, as well as the fiber optic plant communication Expresso™ bus will be utilized in order to provide a homogeneous controls upgrade for the entire plant.  All Egatrol 300 MMI’s (Man Machine Interfaces) will be replaced with BlueLine®’s standards iFix HMI’s (Human Machine Interfaces), utilizing Expresso™ Bus hardware and industrial grade fiber network switches for connectivity.   The BlueLine® Turbine controls system and associated hardware is deployed with redundancy in mind from the HMI through the control and protection of the plant. The following components are to be replaced or upgraded: 

·          Process controllers 70PR05/AS47 – Closed loop controls

·          SC Controller modules – Open loop controls and turbine protection

·          All associated TRIO I/O blocks

·          Existing Bailey GMS System

·          Turbine Enclosure PLC

·          Existing MMI stations

The BlueLine® Turbine Control system is fully compatible with the Procontrol P13 system architecture and fits the existing cabinets, racks and slots without additional reconfiguration. Designed with the needs of today’s turbine operators in mind, our plug-and-play solution is easy to use and requires minimum training. Supported by BlueLine Tools® (BLT), an engineering software to interface with our hardware, the BlueLine® control system will ensure easy tracking of signals and built-in test routines.  System replacement and upgrade will ensure reliable operation of the turbines for the years to come. 

 

 


Comments

Show/Hide Comment form Please login to post comments or replies.
Last Updated on Friday, 09 April 2010 09:37